Line 2: Line 2:
  
 [[jitsbuild-y-frontend|Prev: ​ Y front end]] < [[jitsbuild| Up to Jitsbuild]] > [[jitsbuild-y-axis|Next: ​ Y axis]] [[jitsbuild-y-frontend|Prev: ​ Y front end]] < [[jitsbuild| Up to Jitsbuild]] > [[jitsbuild-y-axis|Next: ​ Y axis]]
 +
 +//This page pertains to the Bukobot v1.  Some portions may be useful to v2 owners. ​ For more information,​ see [[jitsbuild|here]].//​
  
 =====Parts==== =====Parts====
Line 61: Line 63:
 Line up the two holes in the loose half of the metal assembly with the two longer flat-head screws at one end of the bed, and pass the screws through the holes. ​ Then shift the other part of the metal assembly until the third flat-head screw lines up with its hole.  Check that all three screws are vertical and not tilted. (The shorter screw may not be long enough to reach the hole in the T-Plate, so just peer down the hole and look for the screw.) Line up the two holes in the loose half of the metal assembly with the two longer flat-head screws at one end of the bed, and pass the screws through the holes. ​ Then shift the other part of the metal assembly until the third flat-head screw lines up with its hole.  Check that all three screws are vertical and not tilted. (The shorter screw may not be long enough to reach the hole in the T-Plate, so just peer down the hole and look for the screw.)
  
-When everything lines up, apply just enough pressure to the flat metal piece to prevent it sliding over the straight pieces, and gently tighten the four loose screws, just until you feel some drag on the screws - you don't want to damage ​the bed when tightening the screws).  Then carefully lift the metal assembly off the screws and move it to another flat surface, and tighten the screws the rest of the way.+When everything lines up, apply just enough pressure to the flat metal piece to prevent it sliding over the straight pieces, and gently tighten the four loose screws, just until you feel some drag on the screws - you don't want to press down on the bed so much that you damage it.  Then carefully lift the metal assembly off the screws and move it to another flat surface, and tighten the screws the rest of the way.
  
 Move the assembly back to the bed and check that everything still lines up.  Then set this assembly aside. Move the assembly back to the bed and check that everything still lines up.  Then set this assembly aside.
Line 73: Line 75:
 From the platform mounting kit, you will need the M3 button-head screw and the M3x14mm standoff. ​ Put the rest of that sub-kit aside for now. From the platform mounting kit, you will need the M3 button-head screw and the M3x14mm standoff. ​ Put the rest of that sub-kit aside for now.
  
-The screw and the standoff go at the end of the carriage that has one hole.  The screw goes on the bottom of the carriage plate and the standoff goes on the top, pointing up.  (The slots in the long aluminum pieces face up, unless you don't have those, in which case it doesn'​t matter.)+The screw and the standoff go at the end of the carriage that has one hole.  The screw goes on the bottom of the carriage plate and the standoff goes on the top, pointing up.  (The slots in the long aluminum pieces face up, unless you don't have the long aluminum pieces, in which case it doesn'​t matter.) 
 + 
 +Make sure this screw is tight, and check it occasionally when you're using the printer. ​ If it loosens, the back end of the platform will wobble excessively and mess up your prints.
  
 {{wiki:​jitsbuild:​y-carriage-standoff.png}} {{wiki:​jitsbuild:​y-carriage-standoff.png}}
Line 101: Line 105:
 ====Attach the Bearing Assemblies and Tensioner parts==== ====Attach the Bearing Assemblies and Tensioner parts====
  
-Attach the bearing assemblies ​(insert a rod - carefully - before tightening the screws to ensure proper orientation of each pair of bearings) ​and the tensioner parts to the metal assembly as shown. The exact positioning of these tensioner parts will be determined later when assembling the [[jitsbuild-y-axis|Y axis]].+Attach the bearing assemblies and the tensioner parts to the metal assembly as shown. The exact positioning of these tensioner parts will be determined later when assembling the [[jitsbuild-y-axis|Y axis]]
 + 
 +Get out one of the precision steel rods and use it to make sure the linear bearings are straight before you tighten the screws on the bearing holders. ​ Make sure you insert the nice end of the rod, and don't bang the end of the rod against the bearing balls inside.
  
 Bottom view: Bottom view: