===jit's build: Y front end=== (Go back up to [[jitsbuild|jit's build]]) {{wiki:jitsbuild:y-frontend-kit.png}} The items at the top come from the synchromesh cable kit. Not shown in the image above: the Y axis foot. See the last image below for that. Start by cleaning up the large printed plastic part. As with the Y back end, check that the screws and nuts fit. Also widen the two large holes in the Y axis foot if necessary. Assemble as shown: Top view: {{wiki:jitsbuild:y-frontend-topview.png}} The lip on the idler ring is on the bottom. The big washer goes under the bearing. You might actually need two washers there, but this can wait until a later step. Bottom view, showing the Y axis foot: {{wiki:jitsbuild:y-frontend-bottomview.png}} [[jitsbuild-y-carriage|Next: Y carriage]] //The contents of this page may be re-used under any of the following licenses: The [[http://creativecommons.org/licenses/by-sa/3.0/|Creative Commons Attribution-ShareAlike 3.0 Unported License (CC BY-SA 3.0)]], or the [[http://www.gnu.org/copyleft/fdl.html|GNU Free Documentation License (GFDL, version 1.2 or later)]].//